Land surveyors
A lot line adjustment moves the boundary between adjoining parcels without creating any new ones. Under California's Subdivision Map Act, an adjustment between four or fewer adjoining parcels does not need a parcel map or tract map, but it does need approval from the city or county, which checks that the reshaped parcels still meet zoning and building rules. The surveying side is a boundary survey of every parcel involved, an exhibit of the existing and proposed lines, and new legal descriptions. The adjustment is then carried out through recorded documents with LA County or, for Seal Beach and Los Alamitos, Orange County.
A lot line adjustment shifts the boundary between existing adjoining parcels - land comes off one and is added to the other - without creating any additional parcels. California's Subdivision Map Act exempts adjustments between four or fewer adjoining parcels from the mapping it otherwise requires, provided the local agency approves them, and that agency's review is limited mainly to whether the reconfigured parcels comply with the general plan, any applicable specific or coastal plan, and zoning and building rules. Creating new parcels is a different process: a parcel map for four or fewer, a tract map for five or more.
The most common reason here is to make the record match something already built - a block wall, a driveway or a garage that has sat over the line for decades. In Lakewood and Long Beach neighbors sometimes adjust a line to widen a side yard enough for a backyard ADU to meet its setbacks. On commercial land, owners in Carson and Signal Hill use adjustments to reshape parcels ahead of a sale or redevelopment.
The application needs an exhibit showing the existing and proposed lines with new legal descriptions for each resulting parcel, and that starts with a boundary survey of every parcel involved. The exhibit also shows buildings near the new line so the city can confirm setbacks still work. Once approved, the adjustment takes effect through recorded documents - deeds, and sometimes a Record of Survey - so the new line appears in the public record. If monuments are set on the new line, California law generally requires that survey to be filed with the county surveyor.
For parcels in LA County the documents record with the county Registrar-Recorder, and LA County Public Works keeps the survey filings. Seal Beach and Los Alamitos fall under the Orange County Clerk-Recorder and Orange County Surveyor, and each city runs its own review. If either parcel carries a loan, the lender usually has to be involved, and title and ownership questions belong with a real estate attorney or title officer. Where a lender needs the result mapped to title standards, an ALTA/NSPS survey follows the adjustment.
How long does it take? The survey and exhibit are the quicker part. City review and recording set the overall timeline, and they vary by jurisdiction.
These are usually asked for on the same transaction:
Locates your property lines from the recorded tract map and street monuments, and shows where walls, fences and structures sit against them.
Learn More →The national survey standard title insurers and commercial lenders rely on, with every title commitment exception plotted or noted.
Learn More →Lot lines, existing buildings, setbacks, easements, utilities and grades - the measured base an ADU site plan is drawn on.
Learn More →Free - No obligation
Two minutes. We come back to you the same business day.
If it is urgent, call us now on (310) 919-1081
Something went wrong at our end. Call (310) 919-1081 and we will take the details over the phone.